Tab 5 Content
content of Tab 3
| VIEW ROUTE | STARTS AT | ENDS AT | TOTAL STOPS |
|---|---|---|---|
| 401KM Bus Route | Malleshwaram Bus Station,Malleshwaram,BMTC Bus Stand | Kengeri TTMC | 17 |
| 401H Bus Route | Yelahanka,YELAHANKA,BESIDE WATER TANK | Hampinagara RPC Layout,LAST BUS STOP | 46 |
| 401EA Bus Route | Coffee Board Layout | Chandra Layout,CHANDRA LAYOUT,BESIDE B.M.T.C.BUS STAND | 29 |
| 401E Bus Route | Yelahanka,YELAHANKA,BESIDE WATER TANK | Chandra Layout,CHANDRA LAYOUT,BESIDE B.M.T.C.BUS STAND | 49 |
| 401BA Bus Route | Yelahanka,YELAHANKA,BESIDE WATER TANK | Jayanagara 3rd Block,JAYANAGARA 3RD BLOCK,OPPOSITE OF UTL TECHNOLOGIS | 54 |
| 401B Bus Route | Yelahanka,YELAHANKA,BESIDE WATER TANK | Hampinagara RPC Layout,LAST BUS STOP | 46 |
| 401K Bus Route | Yelahanka,YELAHANKA,BESIDE WATER TANK | NGEF Layout,NGEF LAYOUT,IN FRONT OF TEJASWINI PHARMA | 52 |
| 401KB Bus Route | Yeshwanthpura | Kengeri TTMC | 39 |
| 401KC Bus Route | Devasandra Chikkamaranahalli,DEVASANDRA,BESIDE KARNATAKA POWER TRANSMISSION CORPORATION LIMITED | Kengeri TTMC | 44 |
| 401R Bus Route | Yelahanka,YELAHANKA,BESIDE WATER TANK | Raja Rajeshwari Temple,RAJESHWARI NAGARA,BESIDE RAJA RAJESHWARI TEMPLE | 53 |
| 401RC Bus Route | Devasandra Chikkamaranahalli,DEVASANDRA,BESIDE KARNATAKA POWER TRANSMISSION CORPORATION LIMITED | BEML Layout 5th Stage,B.E.M.L. 5TH STAGE,BESIDE B.M.T.C. MAIN BUS STAND | 37 |